26.09.2022 -31.10.2022

The project of arrangement and operation of the fish processing enterprise (multifunctional complex for the production of food products) of "Paliastomi-2004" LTD in the municipality of Khobi

Village Kulevi
The project of arrangement and operation of the fish processing enterprise (multifunctional complex for the production of food products) of "Paliastomi-2004" LTD in the municipality of Khobi
11.10.2022 -28.10.2022

Reconstruction/repairing and operation project of the existing 220 kV voltage substation "Aragvi" by "State Electric System of Georgia"

Village Saguramo
Reconstruction/repairing and operation project of the existing 220 kV voltage substation "Aragvi" by  "State Electric System of Georgia"
21.09.2022 -27.10.2022

Construction-exploitation project of the city of Sighnaghi and the city of Tsnori drainage system and wastewater treatment plant

City Tsnori
Construction-exploitation project of the city of Sighnaghi and the city of Tsnori drainage system and wastewater treatment plant
18.10.2022 -25.10.2022

A Public discussion on the draft amendments to the forest code of Georgia

City Tbilisi
A Public discussion on the draft amendments to the forest code of Georgia
04.10.2022 -24.10.2022

The project of setting up and operating a mineral (sand-gravel) processing enterprise in Chkhorotsku township

Borough Chkhorotsku
The project of setting up and operating a mineral (sand-gravel) processing enterprise in Chkhorotsku township
04.10.2022 -21.10.2022

The construction and operation project of "Alpana HPP" with an installed capacity of 56.9 MW on the Rion River

Village Zogishi
The construction and operation project of "Alpana HPP" with an installed capacity of 56.9 MW on the Rion River
27.09.2022 -13.10.2022

Construction and operation of a polyethylene (waste processing) enterprise in Batumi

City Batumi
Construction and operation of  a polyethylene (waste processing) enterprise in Batumi
26.09.2022 -12.10.2022

210 MW construction-operation project of a wind power plant and a 220 kV substation of JSC "Wind Power"

Village Dirbi
210 MW construction-operation project of a wind power plant and a 220 kV substation of JSC "Wind Power"
12.09.2022 -05.10.2022

Construction and operation project of the "Tbilisi HPP" LLC hydroelectric power station (Tbilisi HPP 20.2 MW) on the Mtkvari River

City Tbilisi
Construction and operation project of the "Tbilisi HPP" LLC hydroelectric power station (Tbilisi HPP 20.2 MW) on the Mtkvari River
06.09.2022 -04.10.2022

Construction and operation of a hydroelectric power station (Tskhenistskali 1 HPP) with an installed capacity of 22.74 MW on the river Tskhenistskali in Lentekhi municipality of "Hydro Invest G AS" LLC

Village Chikhareshi
Construction and operation of a hydroelectric power station (Tskhenistskali 1 HPP) with an installed capacity of 22.74 MW on the river Tskhenistskali in Lentekhi municipality of "Hydro Invest G AS" LLC
  • ««
  • «
  • …
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • …
  • »
  • »»