15.04.2022 -06.05.2022

Construction and operation project of a 4.8 MW hydroelectric power station-Sulori HPP cascade (Sulori 1 HPP and Sulori 2 HPPs) in Vani Municipality

Village Sulori
Construction and operation project of a 4.8 MW hydroelectric power station-Sulori HPP cascade (Sulori 1 HPP and Sulori 2 HPPs) in Vani Municipality
13.04.2022 -04.05.2022

Kaspi municipality, in village Metekhi The arrangement-operation project of a poultry farm (1,800,000 stalls for chickens)

Village Metekhi
Kaspi municipality,  in village Metekhi The arrangement-operation project of a poultry farm (1,800,000 stalls for chickens)
14.04.2022 -03.05.2022

Construction-operation project of a 20.3 MW hydroelectric power plant (Zeskho-1 HPP) in Lentekhi municipality, on the rivers Zeskho and Koruldashi

Village Cana
Construction-operation project of a 20.3 MW hydroelectric power plant (Zeskho-1 HPP) in Lentekhi municipality, on the rivers Zeskho and Koruldashi
24.03.2022 -03.05.2022

The Project of ‘’jeo enterprise’’ metallurgical plant exploitation in Rustavi City

City Rustavi
The Project of ‘’jeo enterprise’’ metallurgical plant exploitation in Rustavi City
19.05.2022 -03.05.2022

Construction-operation of a non-hazardous waste disposal facility (regional landfill) by Georgian Solid Waste Management Company Ltd

Village Mukhiani
Construction-operation of a non-hazardous waste disposal facility (regional landfill) by Georgian Solid Waste Management Company Ltd
29.03.2022 -02.05.2022

The project is for the arrangement and operation of Iberoil Oil Depot Ltd. in Samgori district, Tbilisi

City Tbilisi
The project is for the arrangement and operation of Iberoil Oil Depot Ltd. in Samgori district, Tbilisi
13.04.2022 -02.05.2022

In Borjomi Municipality, Bakuriani, a reservoir (used for water retention or permanent accumulation, and the volume of water retained or accumulated by it is more than 50,000 m3) Arrangement-operation project

Borough Bakuriani
In Borjomi Municipality, Bakuriani, a reservoir (used for water retention or permanent accumulation, and the volume of water retained or accumulated by it is more than 50,000 m3) Arrangement-operation project
29.03.2022 -29.04.2022

Geo + Eco Service Ltd Mineral extraction project (108,997 tons of clay-gypsum (gypsum))

Village Krtsanisi
Geo + Eco Service Ltd Mineral extraction project (108,997 tons of clay-gypsum (gypsum))
30.03.2022 -28.04.2022

Within the framework of the modernization project of the Tbilisi-Makhinjauri main railway of Georgian Railway, the project of amendments to the project of Moliti-Khashuri railway station (including the planned km 20 + 760-23 + 060 near the village of Zvare)

Village Zvare
Within the framework of the modernization project of the Tbilisi-Makhinjauri main railway of Georgian Railway, the project of amendments to the project of Moliti-Khashuri railway station (including the planned km 20 + 760-23 + 060 near the village of Zvare)
12.04.2022 -28.04.2022

Exploitation of oil tank of "Avzi 94" Ltd in Tbilisi (with a 4950.0 m3 reservoir park)

City Tbilisi
Exploitation of oil tank of "Avzi 94" Ltd in Tbilisi (with a 4950.0 m3 reservoir park)
  • ««
  • «
  • …
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • …
  • »
  • »»